25+ YEARS OF EXPERIENCE

ADU CONSTRUCTION IN MASSACHUSETTS

Massachusetts changed the rules — you can now build an accessory dwelling unit on your property by right, no special permit needed. From backyard cottages to garage conversions and in-law suites, we design, permit, and build rental-ready ADUs.

Licenciados y Asegurados
Equipos Propios con Experiencia
Cotizaciones Gratis

COTIZACIÓN GRATIS

Free and no obligation. Tell us about your project.

Free and no obligation. Prefer to talk? Call or text (781) 528-0069.

WHAT'S INCLUDED

Free ADU feasibility & zoning review
Detached backyard cottages
Garage-to-ADU conversions
Basement & attic ADUs
Above-garage apartments
Design, permitting & construction — one contract

OUR ADU BUILDS PROJECTS

ADU Construction project 1
ADU Construction project 2
ADU Construction project 3

WHY CHOOSE INNOVATE BUILDING FOR ADU BUILDS

By-right approval — no variance, no zoning battles
Rental income potential of $2,000–$3,000/month
Turnkey delivery: design through certificate of occupancy
25+ years building in Greater Boston
Licensed (MA CSL) and fully insured
Transparent fixed-price proposals
25+
Años de Experiencia
100%
Equipos Propios con Experiencia
Google Reviews
1K+
Proyectos Completados

OUR PROCESS

1

Feasibility Review

We check your lot, zoning dimensional rules, utilities, and septic capacity — and tell you exactly what you can build.

2

Design & Permits

Architectural plans sized to the 900 sq ft / 50% rule, submitted for a standard building permit. No special permit required.

3

Construction

Foundation to finishes with our own crews — site work, utilities, framing, and interior build-out.

4

Rental-Ready Handoff

Final inspections, certificate of occupancy, and a unit ready for family or tenants.

PREGUNTAS FRECUENTES

Can I really build an ADU without a special permit in Massachusetts?

Yes. Since February 2025, state law allows one ADU up to 900 sq ft (or 50% of your home's floor area, whichever is smaller) by right on any single-family lot. You still need a standard building permit, but towns can no longer require a variance or special permit for a conforming ADU.

How much does an ADU cost to build?

In Greater Boston: basement conversions typically run $80K–$150K, garage conversions $120K–$220K, and detached new-construction ADUs $250K–$500K+ depending on size, site conditions, and finishes. We provide a fixed-price proposal after a feasibility visit.

Can I rent out my ADU?

Yes — long-term rentals are allowed, and towns cannot require you to live on the property. Short-term rentals under 31 days are not permitted under the state ADU law.

Do I need extra parking for an ADU?

Towns may require at most one additional space — and none at all if your property is within a half mile of public transit.

What if my home is on a septic system?

Title 5 capacity is based on bedroom count. We evaluate your system during feasibility; some projects need a septic upgrade, which we price up front — no surprises mid-project.

How long does an ADU project take?

Design and permitting typically take 6–10 weeks, and construction 3–6 months depending on the type — garage and basement conversions are fastest, detached cottages take longest.

GET YOUR FREE ADU BUILDS ESTIMATE

Free on-site consultation. Transparent pricing. No obligation.

Free and no obligation. Prefer to talk? Call or text (781) 528-0069.

Prefer to call? We pick up.